Newsflash

Home arrow About us
About us PDF Print E-mail
Written by Administrator   
Monday, 08 October 2007

 

 Ajin Iron Mining Co.

Date of Establishment: 06.14.1994

Capital: 30 thousand million rials

Specialty:    According to Contractor Qualification Classification Regulation, the company holds:

1.     First grade in the field of ground researcher (highest rank)

2.     Fourth grade in the field of Water

3.     Fifth grade in the field of Transportation

 

 

A. Principal Activities performed and currently are being performed by company are as follow:

    *

      Contract of construction of a deposit filtering dam for Sarcheshmeh Copper with approx. Volume of   3 million Cubic meters.
    *

      Construction of deposit filtering dam of Miduk Copper Complex with the approx. volume of 5 million cubic meters.
    *

      Carry out overburden removal operation and its transportation at Songon Copper mine of Ahar since the forth quarter of year 1379 (Winter 2001), totally for 35 million tons.
    *

      Carry out overburden removal operation at Miduk Copper mines Complex in the variation amount of annual 1 through 10 million tons since 1373 (03.21.1994) totally for 50 million tons.
    *

      Completion of drilling operation and overflowing Depot of Sivand Dam for 20 thousand million rials.
    *

      Extraction and Transportation of about 800,000 tons per year of lime stones required by Shomal Cement Plant.
    *

      Supply heaving materials stone for the side wall of Gavshan Dam in Kurdistan Province up to the end of year 1382 (03.20.2004) with total volume of 4 million tons.
    *

      Extraction and Transportation of about 1 million tons per year of lime stones required by Kurdistan Cement Plant, by the end of year 1378 (march 2000)
    *

      Extraction and Transportation of about 500,000 tons per year of lime stones required by Hegmatan Cement Plant, by the end of year 1377 (march 1999)
    *

      Extraction, separation and loading required materials for Shahid Kalantari Express-way Project over Urmia Lake up to the end of year 1381 (04.20.2003), in the approx cost of 25 thousand million rials.
    *

      Construction of Fresh Water Seafront of Almahdi Aluminum Plant, Bandar Abbas, and supplying required stone materials cost of 3 thousand million rials at the end of year 1375 (march 1997)

B. List of heavy Machinery
      Loader 988, Caterpillar     10 sets
      Loader 470, Komatsu     14 sets
      Shovel     5 sets (with capacity of 12.5 m3 and less)
      Bulldozer D155 & D8N     40 sets
      Bulldozer D355     2  sets
      Kinds of Dump trucks     49 sets
      Grader     5 sets
      Tractor     3 sets
      Mechanical Shovel (Excavator)     4 sets
      Rollers     8 sets
      Trailer Truck      2 sets
      Kinds of Wagon Drill     17 sets (with drilling power of 6 D)

 

C. Employed Personal of Company:
      Simple worker     65 persons  
      Skilled worker     150 persons  
      Servicemen      52 persons  
      Tech. & Specialized Personnel      293 persons  
      Adm. & Financial Personnel      90 persons  
      Technician      23 persons  
      Engineers     55 persons  
      Total      739 persons

Last Updated ( Monday, 22 October 2007 )
 

Related Links